Ervia CCS project background

Ervia is assessing how Carbon Capture and Storage (CCS), located close to large-scale CO2 emitters can play a role in reducing Ireland’s CO2 emissions. As part of this endeavour, Ervia obtained EU Project of Common Interest (‘PCI’) status for both the Ervia Cork CCS Project (as a project promoter) and the Northern Lights CCS transport project (as a project partner) in 2019.

A technical feasibility study on the potential for large-scale CCS in Ireland was completed by Ervia in 2020. The study was a high-level review of available CCS technologies (carbon capture, transport and intermediate onshore storage) and considered their feasibility for use in Ireland. Two emitter cluster case studies were identified. One of these was in the Whitegate / Aghada area of Cork Harbour. The other was in Poolbeg, Dublin Port.

On the basis of the project’s PCI status, part funding was subsequently obtained by Ervia under the EU’s Connecting Europe Fund (CEF) to carry out a Pre-Front End Engineering Design (Pre-FEED) study of the emitter clusters identified above.

Ervia appointed RPS / Bechtel to carry out this Pre-FEED study. It has involved a detailed assessment of the key infrastructure necessary to gather gaseous CO2, liquify it and temporarily store this liquid CO2 at Cork Harbour and Dublin Port for subsequent loading onto ships for export.

The objective of the Pre-FEED study was to develop the design of the facilities to achieve a well-developed process design basis to enable the production of an AACE Class 4 cost estimate for each location.

Cork documents

Scope B Vol 2 – Combined Layout, Schedules, Models & Diagrams

Constraint Maps – Cork
MDE1234-RPS-02-CX-DR-Z-AG0109 OS Map
MDE1234-RPS-02-CX-DR-Z-AG0100 Gas Transmission and Electricity Networks Cork
MDE1234-RPS-02-CX-DR-Z-AG0101 Environmentally Designated Areas and National Inventory of Architectural Heritage
MDE1234-RPS-02-CX-DR-Z-AG0102 Ground Conditions Bedrock Polygons
MDE1234-RPS-02-CX-DR-Z-AG0103 Groundwater Aquifer Vulnerability
MDE1234-RPS-02-CX-DR-Z-AG0104 Ground Conditions Soils
MDE1234-RPS-02-CX-DR-Z-AG0105 Flood Zones and Water Bodies Ecological Status
MDE1234-RPS-02-CX-DR-Z-AG0106 Land Use Zoning from Draft Cork County Development Plan 2021
MDE1234-RPS-02-CX-DR-Z-AG0107 Road Network
MDE1234-RPS-02-CX-DR-Z-AG0108 Proposed CO2 Pipeline Routes
MDE1234-RPS-02-CX-DR-Z-AG0112 Proposed CO2 Pipeline Routes

CO2 Gathering Network Field Architecture Maps – Cork
MDE1234-RPS-02-CX-DR-Z-0000 CO2 Gathering Network Field Architecture Maps (GIS) Key Map
MDE1234-RPS-02-CX-DR-Z-0001 – Page 1 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0002 – Page 2 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0003 – Page 3 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0004 – Page 4 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0005 – Page 5 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0006 – Page 6 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0007 – Page 7 of 8 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-CX-DR-Z-0008 – Page 8 of 8 CO2 Gathering Network Field Architecture Maps (GIS)

MDE1234-RPS-02-CX-RP-Z-RP0001 – Flow Assurance & Hydraulics Analyses
MDE1234-RPS-02-CX-RP-Z-0002 CO2 Network Separation Study report

Scope C Vol 3 – Design Pack Development for CPF

Process Flow Diagrams – Cork
MDE1234-BEC-03-CX-DR-M-PFD0000 Legend & Symbols Sheet
MDE1234-BEC-03-CX-DR-M-PFD0001 Refrigeration Liquefaction System
MDE1234-BEC-03-CX-DR-M-PFD0002 Refrigerant Storage System
MDE1234-BEC-03-CX-DR-M-PFD0003 Regasification
MDE1234-BEC-03-CX-DR-M-PFD0004 CO2 Collection Pipeline Network
MDE1234-BEC-03-CX-DR-M-PFD0005 CO2 Export Network
MDE1234-BEC-04-CX-DR-M-PFD0001 Storage & Ship Loading System

Utility Flow Diagrams – Cork
MDE1234-BEC-03-CX-DR-M-UFD0001 Instrument Air & Nitrogen
MDE1234-BEC-03-CX-DR-M-UFD0002 Storm Water Drain
MDE1234-BEC-03-CX-DR-M-UFD0003 Potable & Utility Water
MDE1234-BEC-03-CX-DR-M-UFD0004 Fire Water Pumps & Tanks
MDE1234-BEC-03-CX-DR-M-UFD0005 Vent Stack & Header

MDE1234-BEC-03-CX-DR-M-BFD0001 Overall Block Flow Diagram – Cork
MDE1234-RPS-03-CX-DR-C-CA0001 Preliminary CPF Plot Plan Layout – Cork

Material Selection Diagrams – Cork
MDE1234-BEC-03-CX-DR-Z-MSD0001 Refrigeration / Liquefaction
MDE1234-BEC-03-CX-DR-Z-MSD0002 Refrigerant Storage System
MDE1234-BEC-03-CX-DR-Z-MSD0003 Regasification
MDE1234-BEC-03-CX-DR-Z-MSD0004 CO2 Collection Pipeline Network
MDE1234-BEC-03-CX-DR-Z-MSD0005 CO2 Export Pipeline
MDE1234-BEC-03-CX-DR-Z-MSD0006 Instrument Air & Nitrogen
MDE1234-BEC-03-CX-DR-Z-MSD0007 Storm Water Drain
MDE1234-BEC-03-CX-DR-Z-MSD0008 Cooling, Potable & Utility Water
MDE1234-BEC-03-CX-DR-Z-MSD0009 Fire Water Pumps & Tanks
MDE1234-BEC-03-CX-DR-Z-MSD0010 Vent Stack & Header
MDE1234-BEC-04-CX-DR-Z-MSD0001 Storage and Ship Loading System

Piping & Instrumentation Diagrams – Cork 
MDE1234-BEC-03-CX-DR-M-PID0000 Symbols and Legends (SHT 1 OF 3)
MDE1234-BEC-03-CX-DR-M-PID0000 Symbols and Legends (SHT 2 OF 3)
MDE1234-BEC-03-CX-DR-M-PID0000 Symbols and Legends (SHT 3 OF 3)
MDE1234-BEC-03-CX-DR-M-PID0001 Inlet Gas Filter
MDE1234-BEC-03-CX-DR-M-PID0002 CO2 Chiller
MDE1234-BEC-03-CX-DR-M-PID0003 Compressor KOD and Refrigeration Compressor Package
MDE1234-BEC-03-CX-DR-M-PID0004 Facility Compressor Aftercooler and Receiver
MDE1234-BEC-03-CX-DR-M-PID0005 Facility Refrigerant Storage Drum & Pump
MDE1234-BEC-03-CX-DR-M-PID0006 Sea Water Pump
MDE1234-BEC-03-CX-DR-M-PID0007 CO2 Send out Pump & Vaporiser Package
MDE1234-BEC-03-CX-DR-M-PID0008 Vent stack
MDE1234-BEC-03-CX-DR-M-PID0009 CO2 Collection Pipeline Network (From Whitegate Refinery & CCGT)
MDE1234-BEC-03-CX-DR-M-PID0010 CO2 Collection Pipeline Network (Valving Station)
MDE1234-BEC-03-CX-DR-M-PID0011 CO2 Export Pipeline
MDE1234-BEC-03-CX-DR-M-PID0012 Collection Pipeline Network (From Aghada CCGT)
MDE1234-BEC-04-CX-DR-M-PID0001 CO2 Spheres & Export Pump
MDE1234-BEC-04-CX-DR-M-PID0002 Boil Off Gas Compressor Package
MDE1234-BEC-04-CX-DR-M-PID0003 Liquid CO2 & Loading System

Process Safeguarding Flow Diagrams – Cork
MDE1234-BEC-03-CX-DR-M-PSFD0001 Refrigeration System
MDE1234-BEC-03-CX-DR-M-PSFD0002 Refrigerant Storage System
MDE1234-BEC-03-CX-DR-M-PSFD0003 Regasification
MDE1234-BEC-04-CX-DR-M-PSFD0001 Storage &Ship Loading

MDE1234-RPS-03-CX-DR-C-SL0001 Preliminary CPF Site Plan – Cork

Dublin documents

Scope B Vol 2 – Combined Layout, Schedules, Models & Diagrams

Constraint Maps Package – Dublin
MDE1234-RPS-02-DX-DR-Z-AG0159 OS Map Dublin
MDE1234-RPS-02-DX-DR-Z-AG0150 Gas Network Dublin
MDE1234-RPS-02-DX-DR-Z-AG0151 Environmentally Designated Areas Dublin
MDE1234-RPS-02-DX-DR-Z-AG0152 Ground Conditions Bedrock and Soils Dublin
MDE1234-RPS-02-DX-DR-Z-AG0153 Groundwater Aquifer Vulnerability Dublin
MDE1234-RPS-02-DX-DR-Z-AG0154 Electricity Network Dublin
MDE1234-RPS-02-DX-DR-Z-AG0155 Flood Zones and Waterbodies Dublin
MDE1234-RPS-02-DX-DR-Z-AG0156 Development Planning Dublin
MDE1234-RPS-02-DX-DR-Z-AG0157 Road Network Dublin
MDE1234-RPS-02-DX-DR-Z-AG0158 Aerial Photography Dublin
MDE234-RPS-02-DX-DR-Z-AG0161 Proposed Routes OS Map Dublin

CO2 Gathering Network Field Architecture Maps (GIS) – Dublin
MDE1234-RPS-02-DX-DR-Z-0000 CO2 Gathering Network Field Architecture Maps (GIS) Key Map – Dublin
MDE1234-RPS-02-DX-DR-Z-0001- Sheet 1 of 2 CO2 Gathering Network Field Architecture Maps (GIS)
MDE1234-RPS-02-DX-DR-Z-0002- Sheet 1 of 2 CO2 Gathering Network Field Architecture Maps (GIS)

MDE1234-RPS-01-DX-01-RP-Z-0001 CO2 Gathering Network Sizing and Flow Assurance Study Report – Dublin
MDE1234-RPS-02-DX-RP-Z-0002 CO2 Gathering Network Safety Separation Study – Dublin

Scope C Vol 3 – Design Pack Development for CPF

MDE1234-BEC-03-DX-DR-E-SHD0002_SIS Shutdown Hierarchy – Dublin

Process Flow Diagrams – Dublin
MDE1234-BEC-03-DX-DR-M-PFD0000 Process Flow Diagrams – Legend & Symbols Sheet
MDE1234-BEC-03-DX-DR-M-PFD0001 Process Flow Diagrams – Refrigeration / Liquefaction
MDE1234-BEC-03-DX-DR-M-PFD0002 Process Flow Diagrams – Refrigerant Storage System
MDE1234-BEC-03-DX-DR-M-PFD0004 Process Flow Diagrams – CO2 Pipeline Collection Network

Utility Flow Diagrams – Dublin
MDE1234-BEC-03-DX-DR-M-UFD0001 Utility Flow Diagrams – Instrument Air & Nitrogen
MDE1234-BEC-03-DX-DR-M-UFD0002 Utility Flow Diagrams – Storm Water Drain
MDE1234-BEC-03-DX-DR-M-UFD0003 Utility Flow Diagrams – Potable and Utility Water
MDE1234-BEC-03-DX-DR-M-UFD0004 Utility Flow Diagrams – Fire Water Pumps & Tanks
MDE1234-BEC-03-DX-DR-M-UFD0005 Utility Flow Diagrams – Vent stack & Header

MDE1234-BEC-03-DX-DR-M-BFD0001_Overall Block Flow Diagram – Dublin

Material Selection Diagarams – Dublin
MDE1234-BEC-03-DX-DR-Z-MSD0002 Material Selection Diagrams – Refrigerant Storage System
MDE1234-BEC-03-DX-DR-Z-MSD0004 Material Selection Diagrams – CO2 Collection Pipeline Network
MDE1234-BEC-03-DX-DR-Z-MSD0006 Material Selection Diagrams – Instrument Air & Nitrogen
MDE1234-BEC-03-DX-DR-Z-MSD0007 Material Selection Diagrams – Storm Water Drain
MDE1234-BEC-03-DX-DR-Z-MSD0008 Material Selection Diagrams – Cooling, Potable & Utility Water
MDE1234-BEC-03-DX-DR-Z-MSD0009 Material Selection Diagrams – Fire Water Pumps & Tanks
MDE1234-BEC-03-DX-DR-Z-MSD0010 Material Selection Diagrams – Vent Stack & Header

Piping & Instrumentation Diagrams – Dublin
MDE1234-BEC-03-DX-DR-M-PID0000 (Sheet 1 of 3) Piping & Instrumentation Diagram Symbols And Legends
MDE1234-BEC-03-DX-DR-M-PID0000 (Sheet 2 of 3) Piping & Instrumentation Diagram Symbols And Legends
MDE1234-BEC-03-DX-DR-M-PID0000 (Sheet 3 of 3) Piping & Instrumentation Diagram Symbols And Legends
MDE1234-BEC-03-DX-DR-M-PID0001 Piping & Instrumentation Diagram Central Processing Facility Inlet Gas
MDE1234-BEC-03-DX-DR-M-PID0002 Piping & Instrumentation Diagram Central Processing Facility C02 Chiller
MDE1234-BEC-03-DX-DR-M-PID0003 Piping & Instrumentation Diagram Compressor KOD and Refrigeration Compressor Package
MDE1234-BEC-03-DX-DR-M-PID0004 Piping & Instrumentation Diagram Central Processing Facility Compressor Aftercooler and Receiver
MDE1234-BEC-03-DX-DR-M-PID0005 Piping & Instrumentation Diagram Central Processing Facility Refrigerant Storage Drum & Pump
MDE1234-BEC-03-DX-DR-M-PID0008 Piping & Instrumentation Diagram Vent stack
MDE1234-BEC-03-DX-DR-M-PID0009 Piping & Instrumentation Diagram CO2 Collection Pipeline Network
MDE1234-BEC-03-DX-DR-M-PID0010 Piping & Instrumentation Diagram – Dublin CO2 Pipeline Network (From Poolbeg Power Station to CPF)

MDE1234-RPS-03-DX-DR-C-CA0001_Preliminary CPF Plot Plan Layout –

MDE1234-RPS-03-DX-DR-C-SL0001_Preliminary CPF Site Plan Layout – Dublin

Process Safeguarding Flow Diagrams – Dublin
MDE1234-BEC-03-DX-DR-M-PSFD0001 Refrigeration System
MDE1234-BEC-03-DX-DR-M-PSFD0002 Refrigerant Storage System

Scope G Vol 7 – Final Project Report

MDE1234-RPS-07-DX-RP-Z-0002_PSDP Report – Dublin